ca roles and responsibilities - 3 - SITE INSPECTIONS
|
Site Inspection frequency is determined by the nature and progress of the works and should include:
(1) The CA recording basic information, which can usefully be done on a standard sheet noting such matters as:
(3) A review of progress in relation to the contract programme. The CA may need to discuss with the contractor action to be taken to ensure the programme is followed. (4) A check on materials being used. Instructions may be required for substitute materials. (5) A check that the works conform to the specification and drawings. The CA may need the assistance of specialist designers of the works (e.g. structural or services engineers) and their inspections should ideally be coordinated with those of the CA. (6) Noting general information to enable the CA to eport to the employer on the progress and quality of the works. (7) Records of any measurement of work that might be needed for certification purposes, particularly where they may be covered up before the valuation date. (8) A general awareness of health and safety arrangements on site, with any concerns being brought to the attention of the contractor. |